50+ years' trade experience Installing across the UK
Menu
Home
About
About UsWhy Choose UsCase StudiesHealth & SafetyEnvironmentCS Group
Services
Kitchen VentilationExtraction Canopies & FiltersAir ConditioningGeneral VentilationService & MaintenanceGas Interlock SystemsKitchen Extract DuctworkBaffle FiltersStainless Steel Wall Cladding
Sectors
All SectorsCommercialLeisure & RestaurantsIndustrialPublic SectorEducationRetail
More
BlogContact
Case Study • Industrial / Energy, Newark

Staythorpe Power Station

Installing 20 air conditioning systems across a £600m combined cycle gas turbine power station, alongside hundreds of other sub-contractors.

What did Cool Stream install at Staythorpe Power Station?

Cool Stream installed 20 air conditioning systems across the water treatment, electrical and chemical dosing buildings at Staythorpe Power Station near Newark, Nottinghamshire, a £600m combined cycle gas turbine plant, working alongside hundreds of other sub-contractors between November 2009 and the end of 2010.

Last updated

Newark, Notts

Location

£600m CCGT Plant

Project value

2009–2010

Delivered

Staythorpe Power Station, Newark

The project

Staythorpe Power Station near Newark, Nottinghamshire was set to become the second largest combined cycle gas turbine (CCGT) power station in the UK — a £600m development built by an Italian consortium, with hundreds of sub-contractors working on site.

What we delivered

  • Installed a total of 20 air conditioning systems across the site
  • Four systems fitted in the water treatment building, two in each of four electrical buildings, and two in each of four chemical dosing buildings
  • Ascon air conditioning systems, manufactured in Italy, with Cool Stream installing the refrigeration pipework connecting indoor units to their outdoor condensing units
  • Pipework runs ranging from 10 to 20 metres, some installed high in roof spaces
  • Condensing units positioned externally on building walls, except in the water treatment building, where units were sited in the main internal space

The challenge: coordination

Installation was intermittent by necessity — coordinating with numerous contractors of different nationalities, each with their own projects, timescales and policies, on a compact brownfield site that had previously housed two coal-fired stations. The project ran from November 2009 through to completion by the end of 2010.

Once complete, Staythorpe was set to power around two million homes and reduce average annual CO2 emissions by up to 7.5 million tonnes compared to an equivalent coal-fired power station — a project Cool Stream Ventilation was proud to play a part in.