Pub kitchens and bars sit close to homes and run long hours. We design extraction, ventilation and air conditioning that keep customers comfortable and neighbours happy.
Often yes, after a survey of the duct route, discharge position and any listed-building or planning constraints.
Pubs often add food to an existing building, with a kitchen squeezed into available space, a bar and dining area alongside and neighbours close by. That makes duct routing, make-up air and noise the hardest parts of the job.
We survey the building, design the extraction and ventilation, fabricate canopies, ductwork and cladding at our own works and install with our own engineers.

The hard questions are where the duct can go and where it can discharge. Older pubs may be listed or in conservation areas, and homes may sit above or alongside. We survey first, design the route with the architect and structural engineer and liaise with the Environmental Health Officer. See planning permission for kitchen extraction.
The kitchen should sit at slightly lower pressure than the bar and dining area so smells stay in the kitchen, and make-up air should not be pulled from the bar. Design the kitchen make-up air and the air conditioning together; see make-up air systems and pub and hotel kitchen ventilation.
Busy bars need fresh air for customers and staff; cellars and stores need extract for heat and humidity. See commercial ventilation systems and commercial air conditioning.
Filters, fans and interlocks need regular attention, and cleaning access matters. See planned maintenance, baffle filters and kitchen extraction systems.
Independent references, so you can check the rules yourself:
Often yes, after a survey of the duct route, discharge position and any listed-building or planning constraints.
Yes. Employers must provide effective and suitable ventilation in every enclosed workplace; bars usually need fresh air and, in many cases, air conditioning.
Where gas appliances rely on the extraction, an interlock connecting the airflow to the gas supply is required.
Yes. We supply and install EHO-compliant stainless steel cladding.
Wherever your site is, we survey, design, manufacture and install. Find your nearest area, or call 07759 696007.