
Why a checklist helps
HVAC plant fails when it is needed most. A checklist turns maintenance from a reaction into a routine, gives engineers a standard to follow and gives you evidence for insurers, landlords and auditors.
Monthly checks (in-house)
- Look for unusual noise, vibration, smells or leaks.
- Clean or check accessible filters.
- Check condensate drains are flowing.
- Check controls, set-points and schedules are correct.
- Record any faults reported by staff.
Quarterly and seasonal checks
| Plant | Check |
|---|---|
| Indoor units | Filters, coils, drain pans and pumps |
| Outdoor units | Coil cleanliness, fan, clearance, debris |
| Air handling units | Filters, belts, bearings, dampers, heat recovery section |
| Extract fans | Motor, belts, vibration, airflow |
| Controls | Sensors, schedules, alarms |
Annual engineer service
Have a qualified engineer service each system: a full inspection, cleaning, electrical checks, performance readings and refrigerant leak checks. F-gas rules require operators to arrange leak checks at intervals set by the charge; see the GOV.UK guidance and our F-Gas guide.
Kitchen extraction
Kitchen extraction is part of the same plant picture: baffle filters, fans, belts, make-up air and the gas interlock need regular checks, and ductwork needs cleaning on a schedule; see winter and Christmas checks and TR/19.
Seasonal priorities
Before summer, check cooling readiness: outdoor coils, condensate drains, refrigerant leak checks and controls. Before winter, check heating mode, belts, filters and the extraction in kitchens. Before peak trading, check anything that must not fail: kitchen extraction, interlocks and key air conditioning. Booking these visits early secures an engineer before the rush, and spreads cost across the year.
Who should do what
Split the work sensibly. Staff can check for faults, keep filters accessible and clean where safe, and report problems promptly. Engineers should handle electrical work, refrigerant, coils, drains, belts, bearings and controls. Keep the log in one place and make someone responsible for it. Agree the arrangement in writing, including what is covered, how often and how quickly faults are attended.
For plant that must not fail, such as kitchen extraction and key cooling, consider more frequent visits in the weeks before peak trading, and agree who to call out of hours. A short pre-season walk-round with your engineer often finds the weak points cheaply, and it gives you a chance to agree priorities, spares and access before the pressure is on.
Records
Keep a log of every inspection, fault, repair and refrigerant movement. It speeds up fault-finding and proves compliance. Our maintenance programmes are tailored to your equipment, environment and budget.
Sources and further reading
Independent references we used, so you can check the rules yourself:
- GOV.UK: Checking F-gas equipment for leaks
- GOV.UK: F-gas guidance for users, producers and traders
- HSE: Ventilation in catering kitchens (Catering Information Sheet 10)
- BESA (Building Engineering Services Association)
Frequently asked questions
How often should commercial HVAC be serviced?
At least annually is common, with more frequent filter and coil checks for busy sites. Follow the manufacturer's guidance.
Who does the F-gas leak check?
A suitably certified engineer, arranged by the operator of the equipment.
What does planned maintenance cost?
It depends on the equipment, number of units and visit frequency. We tailor programmes and quote.
Do you maintain systems you did not install?
Yes. We maintain every type of air conditioning system across all sectors.


