Start with how the building is used
Design begins with the building: what each room is for, how many people use it, when, and what equipment, cooking or processes it contains. A restaurant, an open-plan office and a warehouse need very different ventilation. Employers must provide effective and suitable ventilation in every enclosed workplace under the Workplace (Health, Safety and Welfare) Regulations 1992, so the design has to start from real occupancy.
Work out fresh air and extract
The designer calculates the fresh air each space needs and the extract needed to remove heat, odour, moisture or fumes. Extract must be balanced with supply: an extract ventilation system should be balanced by an input or make-up air system to replace the displaced air.
Choose the system type
| Approach | Typical use |
|---|---|
| Natural ventilation | Small, simple spaces |
| Extract only with make-up grilles | Toilets, stores, small kitchens |
| Supply only | Positive-pressure or filtered fresh-air rooms |
| Balanced supply and extract, often with heat recovery | Offices, restaurants, shops |
See commercial ventilation systems and heat recovery ventilation.
Ductwork, fans and noise
Ductwork routes, sizes and velocities decide airflow, noise and running cost. Fans are selected for the airflow at the system's resistance, with silencers where needed; see commercial extract fans explained.
Controls and energy
Timers, CO2 or occupancy sensors and variable-speed fans stop systems moving more air than necessary. Heat recovery can recover up to approximately 50% of the energy from the extract airstream. Design the controls with the building's operation, not as an afterthought.
Questions to ask a ventilation designer
What fresh-air rate has been used for each space, and why? How is the extract balanced with the supply? Is heat recovery included, and where does the unit go? How will noise be controlled? How will the system be controlled and commissioned? What records and maintenance access are provided? A designer who can answer in plain language has usually done the thinking.
Why early design pays
Ventilation needs space for ducts, plant and access, so it is far cheaper to plan it with the architect than to squeeze it in afterwards. Involve a designer at concept stage, especially for kitchens, plant rooms and buildings with heavy occupancy.
Drawings, commissioning and records
The output of design is scheme drawings and a specification. After installation the system is tested and balanced so each room receives its design airflow, and records are handed over. We survey, design, supply, install and commission commercial ventilation across the UK; see what to expect from a survey.
Sources and further reading
Independent references we used, so you can check the rules yourself:
- HSE: Ventilation in the workplace
- HSE: Workplace health, safety and welfare (L24 Approved Code of Practice)
- GOV.UK: Building Regulations Approved Documents
- CIBSE (Chartered Institution of Building Services Engineers)
- legislation.gov.uk: Workplace (Health, Safety and Welfare) Regulations 1992
Frequently asked questions
What information does a ventilation designer need?
The use of each space, occupancy, equipment and heat loads, building drawings and any planning or landlord limits.
Do I need ventilation if I have air conditioning?
Usually yes. Most air conditioning recirculates room air; fresh air comes from ventilation.
Can ventilation be added to an existing building?
Often, after a survey of routes, plant space and structure.
Who tests the system?
Commissioning engineers measure and balance airflows and record the results.